An existing JAG courtroom at Fort Meade had to be renovated.
The jury box was to be enlarged and the existing rail was to be replaced
by a sturdier rail with 2 sets of gates. The work was delivered and installed
in two days by ARD in September 2011.
![]() |
Prior to quoting ARD provided several Sketchup renderings to give the enduser an idea of how the completed units would look in the space. |
![]() |
The jury box had to be cut on site to go over the platform . The cap and applied moldings and fluted columns match closely to the existing desks |
![]() |
The divider was placed over steel stanchions that were bolted to the floor. The gates are equipped with Bommer cylinder hinges that will provide years of trouble free usage. |
![]() |
A side view of the rail and gates. |